Project Pipeline
Stage 1: Alpha
STATUS: COMPLETE
POLYMINE has successfully assembled a cash-flow positive proof-of-concept rig system for GPU-based cryptocurrency mining. Concurrently, we've demonstrated the ability to utilize algorithms to agnostically switch between coins - mining only the most profitable coins at a given time.
Stage 2: Beta Facility
STATUS: IN PROGRESS
After succesfully building a cash-flow positive alpha GPU-based mining system, POLYMINE is taking the next step to scale with the build-out of its 1mW BETA facility slated to be fully operational by Q4 2018 with 577 rigs.
Stage 3: Hyper-Scale Facility
STATUS: PRELIMINARY
Slated to break ground Q2 2019, POLYMINE will begin construction of its hyper-scale GPU-based mining facility at a TBD location in Alberta, Canada.